The purpose
What does this calculator estimate?
Cubic yards of fill for a berm or raised area — with compaction factor, truckloads, and cost.
Construction & Design · F10
Cubic yards of fill for a berm or raised area — with compaction factor, truckloads, and cost.
Useful forConstruction & DesignPlanningComparisonVerification
Live calculation
✓ Checked May 2026
Enter the berm dimensions, shape, and fill type.
Calculated result
—
Enter the required values to calculate.
Enter the known values. Let the engine handle the calculation.
Planning estimate only. Confirm product labels, equipment specifications, qualified-professional advice and local requirements before acting.
The result, explained
Cubic yards of fill for a berm or raised area — with compaction factor, truckloads, and cost.
The purpose
Cubic yards of fill for a berm or raised area — with compaction factor, truckloads, and cost.
The tool
The method
The relationship
Volume = L × W × H (rectangular) or ½ × L × W × H (triangular profile)
Cubic yards = cubic ft × 0.037. Order ~15% extra for compaction settling.Worked through
| Berm L×W×H | Raw volume | Cubic yards | Ordered CY |
|---|---|---|---|
| 15 × 6 × 2 ft | 180 ft³ | 6.7 CY | 7.7 CY |
| 20 × 8 × 3 ft | 480 ft³ | 17.8 CY | 20.4 CY |
| 30 × 10 × 3 ft | 900 ft³ | 33.3 CY | 38.3 CY |
| 40 × 12 × 4 ft | 1,920 ft³ | 71.1 CY | 81.8 CY |
Why it matters
Order about 15% extra — loose fill compacts down once placed and settled.
A triangular (tapering) berm uses about half the fill of a rectangular block.
Good inputs
The boundary
Confirm structural assumptions, site conditions and local requirements with qualified professionals.
The engine reports invalid inputs and safety warnings beside the result. Resolve those messages before using the estimate.
Before acting
Common questions
Multiply length by width by height for a rectangular berm, or take half of that for a tapering triangular profile, to get cubic feet, then convert to cubic yards. Add about 15 percent for compaction, since loose fill settles when placed. A 20-by-8-by-3-foot rectangular berm needs roughly 20 cubic yards ordered.
Delivered fill is loose and full of air; once spread and compacted it settles to a smaller volume. So you must order more loose material than the finished volume you want — about 15 percent more is typical. Skipping this leaves you short and with under-compacted, unstable ground.
It depends on purpose. Structural fill dirt or engineered fill goes under anything bearing load. Sand suits drainage and bedding. Gravel provides a stable, draining base. Topsoil is for the final planting layer, not for structural support. Using the wrong fill under a load risks settling and damage.
Place and compact the fill in thin layers, called lifts, rather than dumping it all at once — each lift is compacted before the next is added. This produces dense, stable ground that won't settle unevenly later. The compaction factor in the calculator accounts for this volume reduction.
Fill is delivered by the cubic yard, and truck capacity varies, but a standard dump truck carries around 10 to 14 cubic yards. Divide your ordered cubic yards by the truck size and round up. Always confirm the delivery truck can access the placement area before ordering.
L×W×H (or half that for a tapering berm) ÷ 27, plus ~15% for compaction.
Loose fill settles when compacted, so order about 15% more than the finished volume.
Structural fill dirt or engineered fill — not topsoil, which is for the planting layer only.