What does this calculator estimate?
Material to order for the shell including rebound waste — adjusted cubic yards and batch trucks.
Construction & Design · F4
Material to order for the shell including rebound waste — adjusted cubic yards and batch trucks.
Useful forConstruction & DesignPlanningComparisonVerification
Live calculation
✓ Checked May 2026
Enter shell volume and rebound waste.
Calculated result
—
Enter the required values to calculate.
Enter the known values. Let the engine handle the calculation.
Planning estimate only. Confirm product labels, equipment specifications, qualified-professional advice and local requirements before acting.
The result, explained
Material to order for the shell including rebound waste — adjusted cubic yards and batch trucks.
The purpose
Material to order for the shell including rebound waste — adjusted cubic yards and batch trucks.
The tool
The method
The relationship
Ordered yards = shell concrete volume × rebound waste factor
Shell volume = surface area × thickness. Gunite rebound is ~20% (factor 1.20).Worked through
| Pool size | Shell volume | +20% rebound | Order |
|---|---|---|---|
| 28 × 14 ft | 15.8 CY | 19.0 CY | 19 CY |
| 32 × 16 ft | 19.7 CY | 23.6 CY | 24 CY |
| 36 × 18 ft | 24.0 CY | 28.8 CY | 29 CY |
| 40 × 20 ft | 28.7 CY | 34.4 CY | 35 CY |
Why it matters
Gunite rebounds off the rebar and shell as it's shot — order ~20% extra.
Rebound waste is higher on vertical walls than on the floor.
Good inputs
The boundary
Confirm structural assumptions, site conditions and local requirements with qualified professionals.
The engine reports invalid inputs and safety warnings beside the result. Resolve those messages before using the estimate.
Before acting
Common questions
Start with the shell's concrete volume — surface area times thickness — then add a rebound-waste factor of about 20 percent, since a meaningful share of gunite bounces off the rebar and surface as it's sprayed. The adjusted figure is what you actually order so the crew doesn't run short mid-shoot.
Rebound is the material that ricochets off the rebar grid and shell surface during spraying and falls to the floor as waste. It typically runs around 20 percent of the material shot, and is higher on vertical walls than on the floor. Ordering extra to cover rebound prevents running out before the shell is complete.
The shell volume math is identical, but gunite (dry mix hydrated at the nozzle) generally produces more rebound than wet shotcrete, so its waste factor can run a bit higher. Both should still be ordered with a waste allowance and shot continuously for a monolithic shell.
Stopping and restarting creates cold joints — weak seams where fresh material doesn't fully bond to set material — which become crack and leak points. Ordering enough material, including rebound waste, and sequencing the batch trucks ensures the crew can shoot the whole shell without interruption.
Yes. A skilled nozzleman controls angle, distance, and pressure to minimize rebound and place dense, well-consolidated material, which reduces waste and improves shell quality. Less experienced application produces more rebound, so the waste factor — and the amount you order — effectively rises.
About 20% above the shell concrete volume to cover material that bounces off during shooting.
Yes — continuously, to avoid cold joints that create weak, leak-prone seams.
Shell volume (surface area × thickness) times a ~1.20 rebound factor; often 18–24 CY ordered.